Moisture Test Before Painting

ANSAYA PHUKET Villa Painting

The climate of Phuket is tropical, hot all year round, with a rainy season due to the southwest monsoon. Therefore, inspection the wall moisture before painting is very important in painting process.

The moisture within the substrate is a leading cause of coating failures on concrete. If the moisture is elevated, it should be identified and corrected before paint is applied. All villa’s wall in ANSAYA PHUKET was tested by protimeter before painting, the paint will be apply only if the the moisture content (MC) of concrete wall is below 12%.